We’ve arrived at the end of the first week of the great kitchen renovation project with sanity (barely) intact. In case you were wondering, it takes about a full week to adapt to the idea of not having a kitchen, and apparently longer to the idea of not having a sink, because I still catch myself moving toward where the sink used to be with the dregs of a can of soda or snack bowl to be rinsed or an apple to be washed.
We seem to be making good progress. We have passed through the destruction and discovery part of the remodel, which was definitely the most fraught with peril. We discovered several code violations in the wiring and a few outright fire hazards that added another chunk of change to the final bill for some electrical work, including no less than five (FIVE!) issues with the oven outlet alone. The previous owner’s habit of playing fast and loose with structural and electrical issues continues to haunt us six years after the fact, but at least the microwave hood fan will no longer vent to the gap between the walls (sigh) and we know that the household wiring is safer than it was before.
Here’s how we progressed each day of the renovation.
Day one was destruction and discovery day. Greasy stained drywall was removed, subfloor pulled up, mystery pipes were revealed, and electrical hazards became apparent.
Day two comprised more prep work, and the delivery of the bulk of the new cabinets and cupboards. Our dining room became a storage / staging area. Nerves frazzles and frayed.
Day three was dedicated to electrical work. 15 amp wires that ran into 30 amp breakers were updated, dangling outlet boxes were secured, blatant code violations were remediated, and blessed routine was reclaimed from the chaos.
Day four brought fresh drywall and approved permits for the electrical, and a sea change from destruction to construction. Yay progress!
The one thing that the last week has illustrated is that we were insane to even consider taking on the kitchen renovation as a DIY project. There is no way we could have even identified, let alone dealt with, the issues that have come up so far. They weren’t devastating, and they were easily addressed by the contractors, but from tearing up the subfloor to the safety issues with the electrical, I have been grateful to have someone who knows what they are doing. Even if we did manage to install the cupboards and cabinets ourselves, it would have been putting lipstick on a pig because there were so many small but important structural issues that needed to be addressed so we could build upon a strong foundation.
I’m full of optimism for next week, which should bring subfloors and tile floors and fresh paint. I’m also relieved that the last of the major decisions has probably been nailed down, and I will no longer be frantically Googling various faucet models, ceiling fans and over-the-range microwave reviews. Trying to decide whether the drawer pulls need to harmonize with the sink fixtures may have been the nadir in decision-making “who really cares about this sort of thing?” hell, but we’ve made it through to the other side.
We’re managing meals with a mixture of takeout and sandwiches, and I bought more pre-packaged and processed foods in the grocery store today than I’ve probably bought in the last year. I honestly can’t remember the last time I bought packaged cookies, but hey, there were PC Points for Oreos today so I stocked up. An hour later, they’re already mostly gone, of course.
TL;DR? Week one was long and stressful, but could have been far worse. Having a team we trust doing the work has made all the difference in the world. And doing the dishes in the bathroom sink is far from ideal, but at least manageable. With the backdrop of the situation in Fort MacMurray playing out this weekend, I’m grateful to have my house intact and in one piece.
Stay tuned, the adventure continues on Monday!
One thought on “Kitchen renovation phase two: Destruction and chaos”